Facade Consultancy
Post-Tender Stage / Supervision Stage
From award to handover
We ensure your facade is built to specification, on time, and on budget. Our construction-phase services provide rigorous oversight, technical validation, and proactive problem-solving from fabrication through final handover.
Key workstreams
Technical Document Review
Review of contractor submissions including shop drawings, material data sheets, method statements, and calculations.
Ensures compliance with approved design intent, specifications, and performance requirements.
Site Quality Supervision / Inspections
Regular site inspections to monitor façade installation quality and workmanship.
Verifies compliance with drawings, specifications, and approved samples during execution.
As-Built Drawings Review & Handover
Review and verification of as-built façade drawings and documentation.
Ensures records accurately reflect installed systems for final handover and future reference.
Facade Access and maintenance engineering
Preparation and review of Facade Access and maintenance engineering and safety manuals.
Supports safe façade access, long-term maintenance, and compliance with operational standards.
